Welcome to our website

 

We are one of the leading construction companies in kingdom of Saudi Arabia. We turned in to LIMITED LIABILITY COMPANY in the year of 2008 in the field of industry and construction. By the grace of ALLAH we got specialization in the said fields as we have fleet of concerned machinery, excessively trained manpower, expert engineers, dedicated management and sound financial back up to cop up with the requirements of industry and construction.

Mission

 

Implementation of the projects entrusted to us professionally through professional specialists in the field of construction industry working group, and cares about customer satisfaction and uses the latest quality standards, always trying to keep up with developments in construction industry.

Vision

 

Our belief in the permanent development of our performance in line with our ambition and a passion for excellence and leadership keeps us on our quest to be the best in the size and quality of our investments.

Our Infrastructure Projects

  • Water stations
  • Sewage stations
  • Treatment plants (boosting & lifting stations)
  • Storm water and flood reduction projects
  • Sub soil water projects
  • Rain water management projects
  • All kind of infra-structure projects

 

  • NAME OF PROJECT
  • DRAINAGE WATER LIFT STATION-BAHA
  • SEWEGE TREATMENT PLANT-BAHA
  • WATER NETWORK -BANI DABYAN-BAHA
  • WATER NETWORK - PH-2-BAHA
  • STORM WATER & FLOOD REDUCTION-YANBUH-1
  • STORM WATER & FLOOD REDUCTION-YANBUH-2
  • REDUCTION WATER SURFACE AT SAMAR, MANAAR, AJWAD-JEDDAH
  • EXCUTE MAIN LINE FOR SEWEGE NETWORK -BADAR
  • WATER STORAGE AND LINES-ALRAES
  • STORM WATER NETWORK AND REDUCTION SUB SOIL WATER PROJECT-YANBUH-PH1
  • STORM WATER NETWORK AND REDUCTION SUB SOIL WATER PROJECT-YANBUH-PH2
  • STORM WATER NETWORK AND REDUCTION SUB SOIL WATER PROJECT-YANBUH-PH2*
  • STORM WATER NETWORK AND REDUCTION SUB SOIL WATER PROJECT-YANBUH-PH3
  • STORM WATER NETWORK AND REDUCTION SUB SOIL WATER PROJECT-YANBUH-PH4
  • Reduction surface water levels in Yanbu
  • REDUCTION SURFACE WATER LEVELS IN SOME DISTRICTS ( Breiman ,Qoizh , K11, K14 , Matbouli and AL-OLAIA in CITY OF Jeddah
  • REDUCTION SURFACE WATER LEVELS IN SOME DISTRICTS (Sulaymaniyah East (Alrgamh), MUSAED , RAYAH , AL-WAHA AND OBAID IN city of Jeddah
  • REDUCTION SURFACE WATER LEVELS IN AL-SNABEL DISTRICT in CITY OF Jeddah
  • REDUCTION SURFACE WATER LEVELS IN AL-AJAWEED DISTRICT in Jeddah
  • REDUCTION SURFACE WATER LEVELS IN SOME DISTRICTS (Aharazat, Nasim, Petromin2 , Tiaalbh and Qurayyat in CITY OF Jeddah
  • Replacement and development of storm water NETWORK IN Commercial port of Yanbu

 

  • PERIOD
  • 3-YEARS
  • 3-YEARS
  • 2-YEARS
  • 2-YEARS
  • 2-YEAR
  • 2-YEAR
  • 10-MONTH
  • 3-YEARS
  • 3-YEARS
  • 3-YEARS

  • 3-YEARS

  • 2-1/2-YEAR

  • 2-1/2-YEAR

  • 2-1/2-YEAR

  • 2-1/2-YEAR
  • 9 Month

  • 9 Month

  • 9 Month
  • 9 Month
  • 9 Month

  • 2-YEAR

 

  • OWNER
  • MINISTRY OF WATER & POWER
  • MINISTRY OF WATER & POWER
  • MINISTRY OF WATER & POWER
  • MINISTRY OF WATER & POWER
  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS
  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS
  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS
  • MINISTRY OF WATER & POWER
  • MINISTRY OF WATER & POWER
  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS

  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS

  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS

  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS

  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS

  • MINISTRY OF MUNNICIPAL AND VILLAGE AFFAIRS
  • National Water Company

  • National Water Company

  • National Water Company
  • National Water Company
  • National Water Company

  • General Authority for Ports

 

  • OWNER
  • SOUTH ASIAN PILGRIMS ESTABLISHMENT-MAKKAH
  • MINISTRY OF HEALTH
  • MINISTRY OF HEALTH
  • MINISTRY OF INTERIOR
  • MINISTRY OF SOCIAL AFFAIRS
  • MINISTRY OF INTERIOR
  • MINISTRY OF INTERIOR
  • Ministry of Defense
  • Saudi chemicals company

 

  • PERIOD
  • 2-1/2-YEAR
  • 2-1/2-YEAR
  • 2-1/2-YEAR
  • 2-YEARS
  • 2-1/2-YEAR
  • 2-YEARS
  • 2-YEARS
  • 2-YEARS
  • 2-YEARS

 

  • NAME OF PROJECT
  • AL AHILLAH COMMERCIAL CENTRE-MAKKAH
  • 100-BED BAISH GENERAL HOSPITAL-BAISH -JEZAN
  • 100-BED SOUTH OF QUNFUDAH HOSPITAL-ALQUZ-QUNFUDAH
  • ADMINISTRATIVE COMMUNICATION BUILDING - JEDDAH
  • COMPLETE REHIBILITATION CENTRE-ALBAHA
  • CIVIL AFFAIRS BUILDING-JEDDAH
  • GOVERNORATE BUILDING-BADAR
  • Housing of Armed Forces Madina Al Munawra
  • AJA Pharma Factory

Building Projects

NPK

100-BED HOSPITAL PROJECTS BAISH AND SOUTH OF QUNFUDAH

Detail

View

NPK

AL AHILLAH COMMERCIAL CENTRE

Detail

View

NPK

BADAR GOVERNORATE BUILDING

Detail

View

NPK

COMMUNICATION BUILDING

Detail

View

NPK

COMPLETE REHABILITITION CENTRE-BAHA

Detail

View

NPK

JEDDAH CIVIL AFFAIR BUILDING

Detail

View

NPK

AJA Pharma Factory

Detail

View

NPK

Housing of Armed Forces Madina Al Munawra

Detail

View

Ready Mix Concrete

NPK

Ready Mix Concrete

Detail

View

NPK

Ready Mix Concrete

Detail

View

NPK

Ready Mix Concrete

Detail

View

NPK

Ready Mix Concrete

Detail

View

NPK

Ready Mix Concrete

Detail

View

Our Divisions

Mechanical Division

 

  • DRAINAGE WATER NET WORK
  • POTABLE WATER NETWORK
  • IRRIGATION SYSTEM
  • FIRE FIGHTING SYSTEMS LIKE SPRINKLER SYSTEM, FM-200, CO2 SYSTEM, FOAM DALUGE SYSTEM
  • ALL TYPES OF HVAC WORKS LIKE CHILLERS, PACKAGE UNITS, SPLIT UNITS, DUCTIND AND WINDOW UNITS
  • STEAM AND BOILER UNITS
  • MEDICAL GASES NET WORK
  • OXYGEN AND LPG NET WORK
  • ELEVATORS, ACCALATORS AND TRAVELATORS
  • WATER BOOSTING AND PUMPING STATIONS
  • STP, RO AND FOUNTAINS

Electrical Division

 

  • POWER STATIONS
  • TRANSFORMERS
  • MV SWITCH GEAR
  • LV SWITCH GEAR
  • MV CABLING
  • LV CABLING
  • C. B. SYSTEM
  • UPS SYSTEM
  • STANDBY GEN. SET
  • PRIME GEN. SET

 

  • BUILDING ELECTRIFICATION
  • SUPPLY LIGHTING SYSTEMS
  • SUPPLY SWITCH & SOCKET
  • INSTALLATION OF LIGHTS
  • INSTALLATION OF S/W & SOCKET
  • LIGHTENING PROTECTION SYSTEM
  • EARTHING SYSTEM
  • CONDUITING AND WIRING
  • POWER SYSTEMS
  • PANAL BOARDS & CONTROLS

 

  • LOW CURRENT SYSTEMS
  • FIRE ALARM SYSTEM
  • CC TV SYSTEM
  • PUBLIC ADDRESS SYSTEM
  • MA TV SYSTEM
  • MASTER CLOCK SYSTEM
  • TELEPHONE SYSTEM
  • DATA SYSTEM
  • BMS SYSTEM
  • NURSE CALL SYSTEM

Building Projects

Ready Mix Concrete

Infrastructure Projects

Building Material and Concrete Products

A professional technical team with proper training to make sure to follow the best standards and levels of performance. Producing high quality products using heavy equipment (for gravel and screening lines and stone grinders and mixers) to secure the work sites.

CERTIFICATES

 

Our Clients

Contact Us

Address

Head office – Jeddah. P.O. Box 53044 Jeddah 21583
C.R 4030174978 – C.C.No: - 125046

Phone

00966 –2- 6758002

Mobile

00966 –2- 6754003

 

Fax

00966 –2- 6759005

Email

info@npk.com.sa

Website

www.npk.com.sa